Development Infrastructure

Priors Hall Corby Infrastructure Zones 2 & 3

10th June 2022 | 1 min read | admin

Client: Urban & Civic

The site is located on the old steel works in Corby, Northamptonshire. The works consists of primary Infrastructure for a large housing development including 2km of new roads and footways, over 4km of storm and foul drainage, a pumping station, utility services and a large culvert of 2 x 1800mm pipes. An existing roundabout had an extra leg added under a S.278 agreement to facilitate a new access into the development.

A new pre-cast concrete culvert is under construction.

On the project we used Incinerator Bottom Ash (IBAA) as an approved Northamptonshire Council type 1 material and existing limestone 6F2 material was produced on site for use as a capping material.

We used a Solar Pod Generator to power the site cabins, saving 300 litres of gas oil per week and reducing our carbon usage and fuel costs.

Overview of Priors Hall, Corby

Breheny Civil Engineering

Discover more from us.

Copyright © 2026 Breheny Civil Engineering. All rights reserved.

Website by