Installation of 228 Solar Panels
Following the installation of 228 solar panels to our Huntingdon office and workshop buildings, we are delighted to report a 36% reduction in electricity used from the grid over the last 12 months.
This represents a 10 tCO2e reduction of carbon emissions in the 12 months since installation.
Copyright © 2024 Breheny Civil Engineering. All rights reserved